The finish line is on the horizon at Eau Du Soleil on Humber Bay Shores as homeowners begin their pre-delivery inspections in the podium.  We couldn’t be more excited for occupancy to begin in 2019. Watch our latest drone footage and read on to learn more about the construction progress.

Forming is currently at the penthouse level as windows are close behind at floor 57 in the Sky Tower.

dji_0087-1

Forming is complete in the Water Tower as windows reach the 49th floor.

dji_0098

Kitchens and vanities are making their way up from the 14th floor in both towers.

dji_0094

The Sky Tower lobby tile is 95% complete with revolving doors to be installed and interior millwork to start in the coming weeks. Milwork in the Water Tower lobby is complete while tile install will begin in the coming weeks. The concierge desk has been installed and is waiting for granite.
20181026_141239_resized-1

The amenities on the 6th floor are starting to unfold as the Fitness Centre, Spinning Studio, Yoga & Pilates Studio, Kids Play Area and Mixed Martial Arts Room are 85% complete as we anticipate mirror install and exercise equipment.

edsamenities-hr-104

The Salt Water Pool will be tiled in the coming weeks and the Strength Training Zone is awaiting exercise equipment. Flooring will begin in the coming weeks for the amenities on the 7th floor as the Party Room is at 75% completion.

edsamenities-hr-124

Map of Amenities:

eau-du-soleil-amenity-2d-rendering-with-labels

With stunning lake and city views, a limited collection of 1, 2 and 3-bedroom condominiums featuring expansive, terraces are available.

Contact us at 416-789-0288 for details.

View from Infinity Terrace:

edsamenities-hr-120

dji_0094 dji_0082