Eau Du Soleil Construction Update July 2018

We’re mesmerized by the progress at Eau Du Soleil as the building continues to rise up into the Humber Bay Shores skyline. Enjoy the view from our latest drone footage.

Forming on the Sky Tower is currently at floor 57 while formwork continues on the roof of the Water Tower. Once complete the roof will house the Mechanical Room, or as we call it, the heart of the building.

dji_0085

The amenity spaces are starting to take shape as drywall is 90% complete in the common areas.

Drywall is currently on the 30th – 33rd floors of the Water and Sky Tower as windows are being installed on the 45th floor of both towers.

The building envelope will be complete end of October.

Interior suite finishes are well underway with some suites almost complete. dji_0105

Grading of the base of the condominium is underway. This will allow the roads, curbs and sidewalk construction to continue, with landscaping works to follow. With approximately 350 workers on site a day, construction at Eau Du Soleil is on its way to completion.  

dji_0127